Mon, Sep 23, 2019

 

 

Project (2014 - 2015)
Sl. No. Financial Year Dept. Name of Principal Investigator Title of the Project Funding Agency Duration Year of Sanction
1 2014-2015 ETC Chirasree Roychaudhuri Multiple Wireless Sensor System for Monitoring Health Status of Elderly People - Prototype Development and Field Testing DST 2 Years 2014
2 2014-2015 AE&AM Nityananda Nandi Design and development of an automated rice transplanter The Institute of Engineers (India), Kolkata 1 Year 2014
3 2014-2015 Chemistry Ajit Kumar Mahapatra Enzymatic approach to control celiac disease leading to an alternative treatment strategy Dept. of Biotechnology 1 Year 2014
4 2014-2015 Chemistry Bibhutosh Adhikary Morphologically-tuned ternary and heteropolymetallic sulfide nanomaterials: Synthesis, structural characterization and catalytic activities DST 3 Year 2014
5 2014-2015 Mining Pratik Dutta CBM Reserves Estimation for Indian Coalfields Ministry of Coal, Govt. of India 3 Years 2014
6 2014-2015 Mathematics Binayak Samadder Choudhury Developing Fixed Point Theory and Fixed Point Methods in Apllied Mathematics DST (West Bengal) 3 Years 2013

 

Download the list of Project 2014-15 [PDF File]

 

Consultancy (2014 - 2015)
Sl. No. Financial Year Dept. Name of Principal Investigator Title of the Project Funding Agency Duration Year of Sanction
1 2014-2015 Civil Ambarish Ghosh Independent Assessment of effect of vibration, emanating from installation of Sheet Piles using a vibro-sinker at Premises No. 576, Anandapur Plot 1-18 Sector 9-J under EKADPPS, Anandapur, Kolkata - 700107, on the adjoining structures and providing guidance to the construction team Ruby General Hospital Ltd. 3 Months 2014
2 2014-2015 Civil Ambarish Ghosh Soil Exploration Work at three Plots of HIT, Howrah Howrah Improvement Trust 9 Months 2014
3 2014-2015 Civil Ambarish Ghosh Feasibility of acceptance of test result of Dynamic load test instead of static load test for routine load test of 1000/800 mm diameter cast in situ bored piles at Sabang, Paschim Medinipur Bridge and Roof Co. (India) Ltd. 3 Months 2014
4 2014-2015 Civil Arun Kumar Chakraborty Consultancy assignment for conducting Non Destructive Test towards Stability analysis for various R.C.C. structural components for DPC's of Jute Corporation of India Ltd. Webcon Consulting (India) Ltd. 6 Months 2014
5 2014-2015 Civil Saibal Kumar Ghosh Health Monitoring & Vetting of 3 MSC Buildings Ninjas Consultancy & Services, Kolkata 3 Months 2014
6 2014-2015 Civil Sujit Kumar Dalui Analysis of Concrete Mix Design for Strengthening and Widening of SH-6 KCC Buildcon Pvt. Ltd. 2.5 Months 2014
7 2014-2015 Civil Ambarish Ghosh Soil Exploration Work for Proposed Construction of G+5 storied building at Prabhu Jagabandhu College, Jhorehat, Andul-Muuri Prabhu Jagabandhu College, Educational Institute 3 Months 2014
8 2014-2015 Mining Suranjan Sinha & Gopal Chandra Roy Scientific evaluation of Mine Closure Plan with reference to sustainable development framework of Government of India for Dongri Buzurg Mine of MOIL MOIL Limited 8.5 Months 2014
9 2014-2015 Civil Ashis Kumar Bera & Ambarish Ghosh Analysis of Glass Fibre Sardip Consulting Engineers 1 Month 2014
10 2014-2015 Civil Ambarish Ghosh, Sudip Kumar Roy & Santanu Bhanja Vetting of Drawing of 4 lane Elevated Corridor along Kazi Nazrul Avenue (VIP Road) from Kestopur to Jora Mandir IL & FS Infrastructure Development Corporation Limited 9 Months 2013
11 2014-2015 Civil Ambarish Ghosh, Sudip Kumar Roy , Sujit Kumar Dalui & Prabir Kumar Paul Pre tender design advisory consultancy for "Design and construction of 578 m long Theng tunnel including geological investigation and studies, design of tunnel and construction of tunnel proper including Civil as well as Electrical/Mechanical works along with approaches at KM 86.9 on Gangtok-Chungthang road under project Swastik in Sikkim state ITD Cementation India Limited 6 Months 2014
12 2014-2015 Civil Tapas Kumar Roy Vetting of Plan and Estimate of the proposed PG Building Vivekananda Mission Mahavidyalaya, Chaitanyapur, Purba Medinipur 3 Months 2014
13 2014-2015 Civil Ashis Kumar Bera Analysis of Bottom Ash and Steel Plant Slag Material in Ash Dyke as substitute of Sand NTPC-SAIL Power Company Private Limited 6 Months 2014
14 2014-2015 Civil Saibal Kumar Ghosh Structural Stability of Administrative Building of NITA Nabadiganta Industrial Township Authority 3 Months 2014
15 2014-2015 Civil Aparna (Dey) Ghosh Vetting of Design & Drawing of Arsenic cum Iron Removal Plant (AIRP) Effluent & Watertreatment Engineers (P) Ltd. 1 Week 2014
16 2014-2015 Civil Ambarish Ghosh Soil Exploration and Surveying Work at five Sites of Burdwan The Executive Engineer, Burdwan Division, P.W. (CB) Directt. Jagatberth, Surya Nagar, P.O. Sripally, Dist. Burdwan - 713103 6 Months 2013
17 2014-2015 Civil Ambarish Ghosh Soil Exploration Work in connection with the breach of closure work on the left bank of river New Cossye at Garh Purosottampur within Panskura Municipal area, District Purba Medinipur The Chief Engineer (West), Irrigation & Waterways Directorate, Govt. of W.B. 6 Months 2014
18 2014-2015 Civil Ambarish Ghosh Geotechnical Investigation for the Contraction of Proposed RCC Bridge over River Bidya connecting Godkhali and Gosaba Bazar in the District of South 24 Parganas, against vide Memo No. 742, dated 17.12.2013 Highway Survey Division - I.P.W. (Roads) Directorate, Bhabani Bhawan, Kolkata - 700027, Govt. of W.B. 6 Months  2014
19 2014-2015 Civil Sudip Kumar Roy Traffic Study for proposed elevated connector between Belghoria Expressway and Kalyani Expressway …… NH-34. Executive Engineer, Highway Survey Division - I.P.W. (Roads) Directorate 2 Months  2013
20 2014-2015 Civil Ambarish Ghosh Geotechnical Investigation for the Construction of Proposed Elevated connector between Belgharia Expressway and Kalyani Expressway to bypass Barasat Town for North Bengal bound Traffic of NH34 Highway Survey Division - I.P.W. (Roads) Directorate, Bhabani Bhawan, Kolkata - 700027, Govt. of W.B. 6 Months  2013

 

Download the list of Consultancy 2014-15 [PDF File]