Sponsored Research Projects
A. CONSULTATIVE COLLABORATION ON RESEARCH BETWEEN IIEST, SHIBPUR AND KOLKATA METRO RAIL CORPORATION
Sponsoring Agency |
Title of the Project(s) |
Period |
Amount
|
Status |
KMRCL ( Govt. of India Undertaking) |
KOLKATA EAST WEST METRO PROJECT |
Three year June 2017- |
Rs. 41.80 Lakhs for first year only |
ongoing |
RESEARCH PROJECT(S) / SPONSORED PROJECT(S)
B. International
Sponsoring Agency |
Title of the Project(s) |
Period |
Amount
|
Status |
CFC, The Netherlands |
Development and Application of Potentially Important Jute Geo-textiles |
Five year April 2010- June 2016 |
USD 3962826
|
completed |
completed
C. National
Sponsoring Agency |
Title of the Project(s) |
Period |
Amount ( Rs. in Lacs) |
Status |
Higher Education, Science & Technology and Biotechnology (Sci & Tech), Govt. of West Bengal |
Prediction of construction induced vibration and Development of Mitigation Strategy |
Three years March 2018 - |
15.76 |
ongoing |
Ministry of Earth Science |
Near surface Geophysical nd Geotechnical Investigation for Site-specific Earthquake Hazard and Slope Stability studies in and around Gangtok via-a-via its Vulnerability and Risk Implications (VIS) |
Three years August 2015 - |
37.62 |
ongoing |
DST, Govt. of India |
Performance evaluation of river Brahmaputra bed materials for use in construction of road embankment, subgrade and subbase |
Three years August 2013 - |
39.554 |
completed |
Public Health Engg. Directorate, Govt. W. B. |
Hydrogeological study of sub-surface water flow/storage characteristics for creation of sustainable source on rain fed river for semi-arid and fluoride affected six blocks in connection with comprehensive water security plan for Damodar & Kangsabati River under Bankura district. |
One year October 2011 - |
62.800 |
completed |
Ministry of Earth Science |
CONSORTIUM Seismic Hazard Assessment, Microzonation and Evaluation of Vulnerability, Risk & Socio Economic Impacts for the City of Kolkata |
Three years March 2010 |
432.710
|
completed |
TEQIP |
Effect of Contaminated Environment on the Characteristics of Geotextiles and Geonaturals and Development of Remedial Measures |
2005 -2006 |
2.105 |
completed |
D. Consultancy Projects
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
1 |
M/S Larsen & Toubro Limited, Infrastructure IC |
Design, engineering, procurement, construction and completion of 7.4 km, 2(two) lane elevated Road between Jinjira Bazar and Batanagar on Budge Budge Trunk Road in Kolkata along with the widening of the existing 2 (two) lane road by addition of two lanes on both sides of the elevated fly – over through construction of an at grade road and construction of a 1.5 m footpath at the side of at grade roads - Proposal for Vetting of detail design of road, substructure and superstructure
|
2 years |
Rs.50,00,000/- |
Ongoing |
Vetting of Analysis and Design |
2 |
Highway Survey Division – III P. W. (Roads) Directorate Bhabani Bhawan, Kolkata 700 027
|
Geotechnical Investigation for the Construction of Proposed RCC Bridge over River Bidya connecting Godkhali and Gosaba Bazar in the District of South 24 Parganas, |
6 months |
Rs. 39,02,900/- |
Completed |
Field Investigation with laboratory testing and foundation recommendation with state of the art methodologies |
3 |
IL&FS Infrafrastructure Development Corporation Limited
|
Vetting of Drawing of 4 lane Elevated Corridor along Kazi Nazrul Avenue ( VIP Road) from Kestopur to Jora Mandir
|
6 months |
Rs. 14,00,000/- |
Completed |
Vetting the modelling, and analysis of Superstructure and Substructure |
4 |
WAPCOS Ltd.
|
Stability test of Dyke/ Embankment through the proposed Navigational Channel across Nayachara Island as a Long Term Measures of KoPT
|
1 year |
Rs. 5,50,000/- |
Ongoing |
Slope Stability Analysis |
5 |
RITES LIMITED
|
Consultancy services for Project Preparation of Package III: Mogra-Kampa-Barojaguli in the Hooghly and Nadia District of West Bengal, India including Major Bridge over River Saraswati, ROB at Bansberia, Elevated Corridor at Junction of Barrackpore Expressway, Interchange at Kampa Junction and State of Art Extradosed Cable Stayed Bridge ( over river Ganges-Hooghly)
|
One year |
Rs. 4,50,000/- |
Ongoing |
Liquefaction Analysis and Development of Site Specific Response Spectra |
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
6 |
M/S Haldia Energy Limited |
Review on the Structural Safety of River Crossing Transmission Tower across River Hooghly pertaining to 400KV Double Circuit Haldia-Subhasgram Transmission Line |
One year |
Rs. 8,00,000/- |
Completed |
Vetting of analyand designsis |
7 |
Burdwan Development Authority |
Renovation, rehabilitation and Strengthening of old arch masonary bridge over river Banka at Birhata on G.T. Road Burdwan
|
9 months |
Rs. 4,80,000/- |
Ongoing |
Renovation and rehabilitation |
8 |
Nilima Vinimay Pvt. Ltd., 40 A Armenian Street
|
Study on the river bank protection adjoining the proposed construction of multistoried building at 99/1 Dr. Abanu Dutta Road, Howrah |
6 months |
Rs. 250000/- |
Completed |
Analysis and Design |
9 |
M/S ITD Cementation India Limited
|
Pre tender design advisory consultancy for “Design and construction of 578 m long Theng tunnel including geological investigation and studies, design of tunnel and construction of tunnel proper including Civil as well as Electrical/Mechanical works along with approaches at KM 86.9 on Gangtok-Chungthang road under project Swastik in Sikkim state”
|
One Year |
Rs. 5,00,000/- |
Completed |
Analysis and Design |
10 |
Sammilani Mahavidyalaya |
Soil Exploration for Construction of Multi Storied Building in the College Premises
|
6 months |
Rs. 97,000/- |
Completed |
Soil Exploration & Recommendation |
11 |
Kolkata Port Trust |
Review of Structural Stability and Adequacy of Berth 4, 5, & 8 NSD for allowing working of Mobile Harbour Crane (MHC)
|
1 year |
Rs. 2,00,000/- |
Completed |
Analysis and Design |
12 |
Larsen & Toubro Limited, Construction, Infrastructure IC |
Proof Checking of Launching Scheme of Bhatpara ROB & POT PTFE bearing of KMDA Project.
|
1 year |
Rs. 1,00,000/- |
Completed |
Vetting of Design |
13 |
M/S KONGSBERG NORCONTROL PVT. LTD. GUJRAT |
Analysis and Design of Mast and it’s Support System on the building roof top at Sagar |
6 months |
Rs. 60,000/- |
Completed |
Vetting of Design |
14 |
M/S Shapoorji Pallonji and Company Private Limited |
Independent Assessment of effect of vibration, emanating from installation of Sheet Piles using a vibro-sinker at 2 Judge Court Road, Alipore, |
6 months |
Rs. 1,67, 000/- |
Completed |
Vibration Analysis and monitoring |
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
15 |
IRCON INTERNATIONAL LIMITED |
Construction of Subway at Shalimar Railway Station
|
3 months |
Rs. 98,000/- |
Ongoing |
Vetting of Design and Analysis |
16 |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal
|
Soil Investigation for the Proposed Construction of Youth Hostel ( Biswa Bangla Yuba Abas), at 4/1 Moore Avenue, Tollygunge, Kolkata |
6 months |
Rs. 3,20,000/-
|
Ongoing |
Soil Exploration & Recommendation |
17 |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal
|
Soil Investigation for the Proposed Construction of three storied office building of SPF Tollygunge, two storied Group C staff quarters, three nos. four storied Group D staff quarters and single storied change room.
|
6 months |
Rs. 1,48,000/- |
Ongoing |
Soil Exploration & Recommendation |
18 |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal
|
Soil Investigation for the Proposed Construction of Govt. Polytechnic at Behala, Kolkata |
6 months |
Rs. 3,05,000/-
|
Ongoing |
Soil Exploration & Recommendation |
19 |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal
|
Soil Investigation for the Proposed Construction of an English Medium School of Sourindra Vidyapith, Behala, Kolkata |
6 months |
Rs. 1,45,000/- |
Ongoing |
Soil Exploration & Recommendation |
20 |
ADHUNIK INFRASTRUCTURE (P) LTD.
|
Strengthening and Widening to 2 lane/2-lane with paved shoulder configuration of Ghatakpukur – Malancha – Sarberia Section of Kolkata Basanti Road (Section of SH-3) in West Bengal
|
6 months |
Rs. 2,20,000/- |
Ongoing |
Analysis and recommendation |
21 |
M/S Unitech Construction, 74/1 Marwary Bagan, Kolkata |
Vetting of Structural Design of Prabhu Jagatbandhu College at Andual, Howrah
|
6 months |
Rs. 1,00,000/- |
Completed |
Vetting of Design and Analysis |
22 |
Kolkata Port Trust |
Checking of design of VTMS Tower at Dadanpatra |
6 months |
Rs. 80,000/-
|
Completed |
Vetting of Design and Analysis |
23 |
Garhbeta College, Garhbeta, Paschim Medinipur |
Vetting of the Design of Foundation and Superstructure system for the proposed Project “Construction of G+2 Educational Building at Gorhbeta Collage
|
6 months |
Rs. 75,000/- |
Completed |
Vetting of Design and Analysis |
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
24 |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal
|
Soil Investigation for the Proposed Construction of a Building complex for accommodating the West Bengal State Council of Higher Education and West Bengal College Service Commission
|
6 months |
Rs. 2,59,000/- |
Completed |
Soil Exploration & Recommendation |
25 |
Howrah Improvement Trust |
Soil Exploration Work at the junction Belilious Road and Narasingha Dutta Road in connection with the laying of 1400 mm dia. Sewer |
6 months |
Rs. 75000/- |
Completed |
Soil Exploration & Recommendation along with design of temporary supporting system |
26 |
Howrah Improvement Trust |
Soil Exploration Work at Premises No. 117, G T Road, Salkia, Howrah |
6 months |
Rs. 3,25,000/-
|
Completed |
Soil Exploration & Recommendation |
27 |
Howrah Improvement Trust |
Soil Exploration Work at Premises No. 128, G T Road, Salkia, Howrah |
6 months |
Rs. 1,45,000/- |
Completed |
Soil Exploration & Recommendation |
28 |
Prabhu Jagatbandhu College |
Soil Exploration Work for Proposed Construction of G+5 storied building at Prabhu Jagatbandhu College, Jhorehat, Andul-Mouri |
6 months |
Rs. 95000/- |
Completed |
Soil Exploration & Recommendation |
29 |
Howrah Improvement Trust |
Soil Exploration Work at HIT Scheme No. VI, Holding No. 144,144/3, 145/1, 146, 146/1, 146/2, 147(P), Naskarpara Road, Ghusuri, Salkia, Howrah for the work: - Construction of Old Age Home |
6 months |
Rs. 1,80,000/- |
Completed |
Soil Exploration & Recommendation |
30 |
PW(CB) Dte |
Soil Exploration for Construction of a new Government English Medium School in Matikole area under South Dum Dum Municipality, WB, India |
6 months |
Rs. 1,30,000/- |
Completed |
Soil Exploration & Recommendation |
31 |
M/S Ruby General Hospital
|
Independent Assessment of effect of vibration, emanating from installation of Sheet Piles using a vibro-sinker at Premises No. 576, Anandapur Plot 1-18 Sector 9-J under EKADPPS, Anandapur, Kolkata -700 107, on the adjoining structures and providing guidance to the construction team
|
6 months |
Rs. 1,70,000/- |
Completed |
Independent Assessment of effect of vibration |
32 |
Howrah Improvement Trust |
Soil Exploration Work at three Plots of HIT |
One year |
Rs. 5,90,000/- |
Completed |
Soil Exploration & Recommendation |
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
33 |
P. W. (CB) Directt. |
Soil Exploration Work two colleges, one university and six BLRO Office Sites at Burdwan |
6 months |
10,43,000/- |
Completed |
Soil Exploration & Recommendation |
34 |
Highway Survey Division – III P. W. (Roads) Directorate Bhabani Bhawan, Kolkata 700 027
|
Geotechnical Investigation for the Construction of Proposed Elevated connector between Belgharia Expressway and Kalyani Expressway to bypass Barasat Town for North Benfal bound Traffic of NH34 |
6 months |
Rs 3,50,000/- |
Completed |
Field Investigation with laboratory testing and foundation recommendation with state of the art methodologies |
35 |
Irrigation & Waterways Directorate |
Soil Exploration Work in connection with the breach of closure work on the left bank of river New Cossye at Garh Purosottampur within Panskura Municipal area, District Purba Medinipur
|
6 months |
Rs. 2,85,000/-
|
Completed |
Soil Exploration & Recommendation |
36 |
M/S Larsen & Toubro Limited, Construction Infrastructure IC |
Vetting of detail design of substructures and superstructure of Kalyani ROB of KMDA Flyovers and ROBs |
6 months |
Rs. 3,80,000/- |
Completed |
Vetting the modelling, analysis and Design of Superstructure and Substructure |
37 |
M/S Larsen & Toubro Limited, Construction Infrastructure IC |
Vetting of detail design of substructures and superstructure of Chandan Nagar ROB of KMDA Flyovers and ROBs excluding span between P19 and P20 along with the proposed road including the minor bridge over river Saraswati |
One Year |
Rs. 9,00,000/- |
Completed |
Vetting the modelling, analysis and Design of Superstructure and Substructure including pavement design |
38 |
M/S Universal Crescent Power Pvt. Ltd. |
Liquefaction analysis for Industrial Activity at Nayachar
|
6 months |
Rs. 1,50,000/- |
Completed |
Liquefaction analysis |
39 |
M/S Netaji Subhas Chandra Bose Cancer Reserch Institute & Hospital, Kolkata |
Design of Temporary Shoring System Using Sheet pile for 2B+G+3 Hospital Building |
One yaer |
Rs, 3,00,000/- |
Completed |
Design of Geotechnical & Structural Component of Shoring system
|
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
40 |
M/s Fortune Multi-specialty Hospital Pvt. Ltd. |
Planning and Design of Hospital Building at LALBAGH, MUSHIDABAD
|
One year |
Rs. 12,50,000/-
|
Completed |
Surveying, Soil Exploration, Planning, Analysis, Design and Working Drawing |
41 |
M/S Express Devcon Pvt. Ltd
|
Assessment of vibration emanating from installation of Sheet Piles using a vibro-sinker at 52/1, Shakespeare Sarani, Kolkata -700 017
|
One year |
Rs. 3,84,999/- |
Completed |
Vibration Monitoring and Mitigation |
42 |
Traders and Engineers Pvt. Ltd. |
Vetting of Design & Drawing prepared by our consultant in connection with the proposed project of “ Design, Construction and Commissioning of R.C.C. Intake Jetty with Pump House mounted on the Jetty of capacity 2800 Cu.M along with the Sub-Station Building all Civil and Electro-mechanical works complete, near Gouranga Ghat Road in Ward No. 3 under Panihati Municipality”.
|
3 months |
Rs. 50,000/- |
Completed |
Vetting of the design and drawings |
43 |
P. W. (CB) Directt. |
Soil Exploration Work at Five Sites at Burdwan Medical College Campus
|
4 months |
Rs. 5,35,000/- |
Completed |
Soil Exploration & Recommendation |
44 |
Traders and Engineers Pvt. Ltd. |
Vetting / Approval of the Designs of the Diaphragm Wall System at IB167, Sector – III, Saltlake City, Kolkata
|
1 month |
Rs. 50,000/- |
Completed |
Vetting of the design and drawings |
45 |
IVRCL, Kalyani |
Pile Integrity Testing at the Campus of National Institute of Bio-Medical Genomics at Kalyani, West Bengal, INDIA
|
1 month |
Rs. 55,000/- |
Completed |
Testing and Analysis |
46 |
Engineering Projects (India) LTD. |
Soil Exploration for Cyclone Shelters at Village: Amtalia, District: Purba Medinipur.
|
3 months |
--- |
Completed |
Soil Exploration & Recommendation |
47 |
( Agri Irrigation), Chinsurah (A-I) Division, Hooghly |
Soil Exploration Work at Plot No. 2647 & 2646, Mouza – Baidyabati.
|
3 months |
Rs. 79,500/- |
Completed |
Soil Exploration & Recommendation |
48 |
HOWRAH IMPROVEMENT TRUST |
Soil Exploration at different Infrastructure Projects of HOWRAH IMPROVEMENT TRUST ( ten sites) |
One year |
Rs. 14,94,450/- |
Completed |
Soil Exploration & Recommendation
|
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
49 |
M/S Minakshi Sarkar |
Vetting of Foundation System and Superstructure Rajib Gandhi Stadium, Aizwal |
6 months |
Rs. 70,000/- |
Completed |
Vetting of the design and drawings |
50 |
HOWRAH IMPROVEMENT TRUST |
Soil Exploration Work at different Infrastructure Projects of HOWRAH IMPROVEMENT TRUST ( six sites)
|
6 months |
Rs. 5,35,000/- |
Completed |
Soil Exploration & Recommendation |
51 |
Traders and Engineers Pvt. Ltd. |
Vetting of Design & Drawings prepared by consultant in connection with the Proposed Project “Design, Engineering, Construction of RCC Intake Jetty with Pump House, Gangway, Substation and Allied Civil works for 10P10 KMDA Bally WTP Project
|
3 months |
Rs.52, 250/- |
Completed |
Vetting of the design and drawings |
52 |
KoPT |
Consultancy Services for Dyke on the Western Fringe of Sagar Iland |
1 year |
Rs. 3,00,000/- |
Completed |
Vetting of the design by WAPCOS Ltd. and Examination and vetting of the design by selected contractor |
53 |
Students Health Home, Kolkata |
Structural Design of Students Dormitory and Ancillary Infrastructure at Dihga, WB INDIA |
6 months |
-- |
Completed |
Design and reinforcement detailing |
54 |
Students Health Home, Kolkata |
Soil Exploration of Students Dormitory and Ancillary Infrastructure at Dihga, WB INDIA
|
3 months |
Rs. 75000/- |
Completed |
Soil Exploration & Recommendation |
55 |
Traders and Engineers Pvt. Ltd |
Vetting and Design Drawing in connection with the Project of RCC Intake Jetty with mounted Pump House alng with substation Building on Shore at Jagatdal under Bhatpara Municipality KMDA
|
6 months |
Rs.52, 250/- |
Completed |
Vetting of the design |
56 |
Siliguri Jalpaiguri Development Authority |
Design of Foundation system and Vetting of Structural analysis of 4th Market Complex, at Siliguri
|
3 months |
Rs. 300000/- |
Completed |
Design and vetting Analysis |
57 |
Siliguri Jalpaiguri Development Authority |
Pile Integrity Testing at 4th Market Complex, at Siliguri |
3 months |
Rs. 1,58,750/- |
Completed |
Testing & Analysis
|
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
58 |
TATA Consulting Engineers Limited |
Simulation Testing of Coal Washery Slurry for Designing Slurry Pond |
6 months |
Rs. 1,35,000/- |
Completed |
Simulation Study and Analysis |
59 |
CESC Properties Ltd. |
Assessment of vibration emanating from installation of Sheet Piles using vibro-shaker at SPENCER’s GALLERIA Site at 33 Syed Amir Ali Avnue, Kolkata – 700 017 |
6 months |
Rs. 1,25,000/- |
Completed |
Analysis of Vibration and development of Isolation system |
60 |
SENES, India |
Kolkata Solid Waste Management Improvement Project |
Started in March’ 08
|
--- |
Completed |
Vetting of Analysis & Design of Geotecnical components |
61 |
KoPT, India |
Feasibility study for a suitable measure to protect the river bank at proposed terminal site of IWAI at Jogighopa, Assam, West Bengal
|
--- |
Rs. 75,000/- |
Completed |
Analysis & Design |
62 |
BDO, Daspur, India |
Soil Investigation for the Proposed Administrative Building, DASPUR – II, Paschim Medinipur, West Bengal
|
0.5 year |
--- |
Completed |
Analysis & reporting |
63 |
Hindalco Industries Limited, India |
Soil Geochemistry, Fertility and Effectiveness of Various Environmental Control Measures for Bagru Mines, Lohardaga, Jharkhand
|
0.5 year |
Rs. 68,000/- |
Completed |
Analysis |
64 |
BSNL, India |
Soil Investigation and Foundation Design of 40 m Tower at Barasat, Kolkata
|
0.5 year |
Rs. 40,000/- |
Completed |
Analysis & Design |
65 |
BSNL, India |
Analysis and Design of MAAR Masts on Roof Top Around Kolkata
|
1.0 year |
--- |
Completed |
Analysis & Design |
66 |
ECL, India |
Investigation and Testing of Road Bridge at Lalmatia – Pirpainty Road
|
0.5 year |
--- |
Completed |
Analysis & Design |
67 |
KMC, India |
Soil investigation for the proposed Star Theatre, Kolkata
|
1.0 year |
--- |
Completed |
Analysis |
68 |
KoPT, India |
Volume of Dredging and Bulk Density of Dredged Material |
1.5 years |
Rs. 2,00,000/- |
Completed |
Modelling,Analysis guidelines
|
Sl. No |
Sponsoring Agency |
Title of the Project(s) |
Duration |
Amount (Rs.) |
Status |
Nature of work |
69 |
HAM, Holland DCI, India |
Testing of Dredged Soil at Haldia
|
4 years |
Rs. 25,00,000/- (Approx) |
Completed |
Analysis |
70 |
BHEL, India |
Field Quality Assessment for Concrete and Soil for Bakreshwar Thermal Power Project
|
4 years |
Rs. 20,00,000/- (Approx) |
Completed |
Quality control |
71 |
NBCC |
B+G+10 Residence for hon’ble Minister of Govt of WB at Alipore |
6 months |
Rs. 3,50,000/- |
Completed |
Vetting of Design and Drawing |
72 |
NBCC |
B+G+2 Kolkata House of Govt of WB |
6 months |
Rs. 3,50,000/- |
Completed |
Vetting of Design and Drawing |
73 |
ILFS |
Vetting of Drawing of 4 lane Elevated Corridor along Kazi Nazrul Avenue ( VIP Road) |
2 years |
Rs. 14,00,000/- |
|
|
74 |
L&T |
Design, engineering, procurement, construction and completion of 7.4 km, 2(two) lane elevated Road between Jinjira Bazar and Batanagar on Budge Budge Trunk Road in Kolkata along with the widening of the existing 2 (two) lane road by addition of two lanes on both sides of the elevated fly – over through construction of an at grade road and construction of a 1.5 m footpath at the side of at grade roads - Proposal for Vetting of detail design of road, substructure and superstructure. |
3 years |
Rs. 50,00,000/- |
|
|
77 |
Adhunik Infrastructure (P) Ltd. |
Technical Vetting of the Structural Modeling, Analysis, Design and Drawing of the Proposed Skywalk Bridge at Dakshineswar Temple in Kolkata |
2 years |
Rs. 5,00,000/- |
|
|
80 |
M/S Sapoorji Pallonji Pvt. Ltd |
Independent Assessment of effect of vibration, emanating from installation of driven piles in Sukhobrishti Project at Plot No. E1/E2 Action area III, New Town - Recommendations on feasibility of doing RCC during driving of piles nearby and providing guidance to the construction team |
6 months |
Rs. 2,25,000/- |
|
|
|
M/S Siddha |
Independent Assessment of effect of vibration, emanating from installation of Piles using a vibro-sinker at SIDDHA SUBURBIA Project, Baruipur, on the adjoining structures and providing guidance to the construction team. |
6 months |
Rs. 2,00,000/- |
|
|
|
|
Supervision of Sub-surface Investigation and Preparation of Soil Report for the Work of “Construction of 3MG Capacity Booster Pumping Station Near Sakuntala Park in HO-CHI-MIN Sarani Word No. 127”. |
6 months |
Rs. 1,50,000/- |
|
|