Sponsored Research Projects

A. CONSULTATIVE COLLABORATION ON RESEARCH BETWEEN IIEST,  SHIBPUR AND KOLKATA METRO RAIL CORPORATION

Sponsoring Agency

Title of the Project(s)

Period

Amount

 

Status

KMRCL ( Govt. of India Undertaking)

KOLKATA EAST WEST METRO PROJECT

Three year 

June  2017-

Rs. 41.80 Lakhs for first year only

ongoing

 

 

RESEARCH PROJECT(S) / SPONSORED PROJECT(S)

 

 

 

B. International

Sponsoring Agency

Title of the Project(s)

Period

Amount

 

Status

CFC, The Netherlands

Development and Application of Potentially Important Jute Geo-textiles

Five year

April 2010- June 2016

USD 3962826

 

completed

completed

C. National

Sponsoring Agency

Title of the Project(s)

Period

Amount

( Rs. in Lacs)

Status

Higher Education, Science & Technology and Biotechnology (Sci & Tech), Govt. of West Bengal

 

 Prediction of construction induced vibration and Development of Mitigation Strategy

Three years March 2018 -

15.76

ongoing

Ministry of Earth Science

Near surface Geophysical nd Geotechnical Investigation for Site-specific Earthquake Hazard and Slope Stability studies in and around Gangtok via-a-via its Vulnerability and Risk Implications (VIS)

Three years August 2015 -

37.62

ongoing

DST, Govt. of India

Performance evaluation of river Brahmaputra  bed materials for use in construction of road embankment, subgrade and subbase

Three years August 2013 -

39.554

completed

Public Health Engg. Directorate,

Govt. W. B.

Hydrogeological study of sub-surface water flow/storage characteristics for creation of sustainable source on rain fed river for semi-arid and fluoride affected six blocks in connection with comprehensive water security plan for Damodar & Kangsabati River under Bankura district.

One year October 2011 -

62.800

completed

Ministry of Earth Science

CONSORTIUM Seismic Hazard Assessment, Microzonation and Evaluation of  Vulnerability, Risk & Socio Economic Impacts for the City of Kolkata

Three years

March 2010

432.710

 

completed

TEQIP

Effect of Contaminated Environment on the Characteristics of Geotextiles and Geonaturals and Development of Remedial Measures

2005 -2006

2.105

completed

 

 

D. Consultancy Projects

 

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

1

M/S Larsen & Toubro Limited, Infrastructure IC  

Design, engineering, procurement, construction and completion of 7.4 km, 2(two) lane elevated Road between Jinjira Bazar and Batanagar on Budge Budge Trunk Road in Kolkata along with the widening of the existing 2 (two) lane road by addition of two lanes on both sides of the elevated fly – over through construction of an at grade road and construction of a 1.5 m footpath at the side of at grade roads  - Proposal for Vetting of detail design of road, substructure and superstructure

 

2 years

Rs.50,00,000/-

Ongoing

Vetting of Analysis and Design

2

Highway Survey Division – III

P. W. (Roads) Directorate

Bhabani Bhawan, Kolkata 700 027

 

Geotechnical Investigation for the Construction of Proposed RCC Bridge over River Bidya connecting Godkhali and Gosaba Bazar in the District of South 24 Parganas,

6 months

Rs. 39,02,900/-

Completed

Field Investigation with laboratory testing and foundation recommendation with state of the art methodologies

3

IL&FS Infrafrastructure Development Corporation Limited

 

Vetting of Drawing of 4 lane Elevated Corridor along Kazi Nazrul Avenue ( VIP Road) from Kestopur to Jora Mandir

 

6 months

Rs. 14,00,000/-

Completed

Vetting the modelling, and analysis of Superstructure and Substructure

4

WAPCOS Ltd.

 

Stability test of Dyke/ Embankment through the proposed Navigational Channel across Nayachara Island as a Long Term Measures of KoPT 

 

1 year

Rs. 5,50,000/-

Ongoing

Slope Stability Analysis

5

RITES LIMITED

 

Consultancy services for Project Preparation of Package III: Mogra-Kampa-Barojaguli in the Hooghly and Nadia District of West Bengal, India including Major Bridge over River Saraswati, ROB at Bansberia, Elevated Corridor at Junction of Barrackpore Expressway, Interchange at Kampa Junction and State of Art Extradosed Cable Stayed Bridge ( over river Ganges-Hooghly)

 

One year

Rs. 4,50,000/-

Ongoing

Liquefaction Analysis and Development of Site Specific Response Spectra

 

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

6

M/S Haldia Energy Limited

Review on the Structural Safety of River Crossing Transmission Tower across River Hooghly pertaining to 400KV  Double Circuit Haldia-Subhasgram Transmission Line

One year

Rs. 8,00,000/-

Completed

Vetting of analyand designsis

7

Burdwan Development Authority

Renovation, rehabilitation and Strengthening of old arch masonary bridge over river Banka at Birhata on G.T. Road Burdwan

 

9 months

Rs. 4,80,000/-

Ongoing

Renovation and rehabilitation

8

Nilima Vinimay Pvt. Ltd., 40 A Armenian Street

 

Study on the river bank protection adjoining the proposed construction of multistoried building at 99/1 Dr. Abanu Dutta Road, Howrah

6 months

Rs. 250000/-

Completed

Analysis and Design

9

M/S ITD Cementation India Limited

 

 

 

 

 

Pre tender design advisory consultancy for “Design and construction of 578 m long Theng tunnel including geological investigation and studies, design of tunnel and construction of tunnel proper including Civil as well as Electrical/Mechanical works along with approaches at KM 86.9 on Gangtok-Chungthang road under project Swastik in Sikkim state”

 

One Year

Rs. 5,00,000/-

Completed

Analysis and Design

10

Sammilani Mahavidyalaya

Soil Exploration for Construction of Multi Storied Building in the College Premises

 

6 months

Rs. 97,000/-

Completed

Soil Exploration & Recommendation

11

Kolkata Port Trust

Review of Structural Stability and Adequacy of Berth 4, 5, & 8 NSD for allowing working of Mobile Harbour Crane (MHC)

 

1 year

Rs.   2,00,000/-

Completed

Analysis and Design

12

Larsen & Toubro Limited, Construction, Infrastructure IC

Proof Checking of Launching Scheme of Bhatpara ROB & POT PTFE bearing of KMDA Project.

 

1 year

Rs. 1,00,000/-

Completed

Vetting of Design

13

M/S KONGSBERG NORCONTROL PVT. LTD. GUJRAT

Analysis and Design of Mast and it’s Support System on the building roof top at Sagar

6 months

Rs. 60,000/-

Completed

Vetting of Design

14

M/S Shapoorji Pallonji and Company Private Limited

Independent Assessment of effect of  vibration, emanating from installation of Sheet Piles using a vibro-sinker at 2 Judge Court Road, Alipore,

6 months

Rs. 1,67, 000/-

Completed

Vibration Analysis and monitoring

 

 

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

15

IRCON INTERNATIONAL LIMITED

Construction of Subway at Shalimar Railway Station

 

3 months

Rs. 98,000/- 

Ongoing

Vetting of Design and Analysis

16

Kolkata Division, Social Sector, P. W. Dte.,  Govt. of West Bengal

 

Soil Investigation for the Proposed Construction of Youth Hostel ( Biswa Bangla Yuba Abas),  at  4/1 Moore Avenue, Tollygunge, Kolkata

6 months

Rs. 3,20,000/-

 

Ongoing

Soil Exploration & Recommendation

17

Kolkata Division, Social Sector, P. W. Dte.,  Govt. of West Bengal

 

Soil Investigation for the Proposed Construction of three storied office building of SPF Tollygunge, two storied Group C staff quarters, three nos. four storied Group D staff quarters and single storied change room.

 

6 months

Rs. 1,48,000/-

Ongoing

Soil Exploration & Recommendation

18

Kolkata Division, Social Sector, P. W. Dte.,  Govt. of West Bengal

 

Soil Investigation for the Proposed Construction of Govt. Polytechnic at Behala, Kolkata

6 months

Rs. 3,05,000/-

 

Ongoing

Soil Exploration & Recommendation

19

Kolkata Division, Social Sector, P. W. Dte.,  Govt. of West Bengal

 

Soil Investigation for the Proposed Construction of an English Medium School of Sourindra Vidyapith, Behala, Kolkata

6 months

Rs. 1,45,000/-

Ongoing

Soil Exploration & Recommendation

20

ADHUNIK INFRASTRUCTURE (P) LTD.

 

Strengthening and Widening to 2 lane/2-lane with paved shoulder configuration of Ghatakpukur – Malancha – Sarberia Section of Kolkata Basanti Road (Section of SH-3) in West Bengal

 

6 months

Rs. 2,20,000/-

Ongoing

Analysis and recommendation

21

M/S Unitech Construction, 74/1 Marwary Bagan, Kolkata

Vetting of Structural Design of Prabhu Jagatbandhu College at Andual, Howrah

 

6 months

Rs. 1,00,000/-

Completed

Vetting of Design and Analysis

22

Kolkata Port Trust

Checking of design of VTMS Tower at  Dadanpatra

6 months

Rs.   80,000/-

 

Completed

Vetting of Design and Analysis

23

Garhbeta College, Garhbeta, Paschim Medinipur

Vetting of the Design of Foundation and Superstructure system for the proposed Project “Construction of G+2 Educational Building at Gorhbeta Collage

 

6 months

Rs. 75,000/-

Completed

Vetting of Design and Analysis

 

 

 

 

 

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

24

Kolkata Division, Social Sector, P. W. Dte.,  Govt. of West Bengal

 

Soil Investigation for the Proposed Construction of a Building complex for accommodating the West Bengal State Council of Higher Education and West Bengal College Service Commission

 

6 months

Rs. 2,59,000/-

Completed

Soil Exploration & Recommendation

25

Howrah Improvement Trust

Soil Exploration Work at the junction Belilious Road and Narasingha Dutta Road in connection with the laying of 1400 mm dia. Sewer

6 months

Rs. 75000/-

Completed

Soil Exploration & Recommendation along with design of temporary supporting system

26

Howrah Improvement Trust

Soil Exploration Work at Premises No. 117, G T Road, Salkia, Howrah

6 months

Rs.   3,25,000/-

 

Completed

Soil Exploration & Recommendation

27

Howrah Improvement Trust

Soil Exploration Work at Premises No. 128, G T Road, Salkia, Howrah

6 months

Rs. 1,45,000/-

Completed

Soil Exploration & Recommendation

28

Prabhu Jagatbandhu College

Soil Exploration Work for Proposed Construction of

G+5 storied building at Prabhu Jagatbandhu

College, Jhorehat, Andul-Mouri

6 months

Rs. 95000/-

Completed

Soil Exploration & Recommendation

29

Howrah Improvement Trust

Soil Exploration Work at HIT Scheme No. VI, Holding No. 144,144/3, 145/1, 146, 146/1, 146/2, 147(P), Naskarpara Road, Ghusuri,  Salkia, Howrah for the work: - Construction of Old Age Home

6 months

Rs. 1,80,000/-

Completed

Soil Exploration & Recommendation

30

PW(CB) Dte

Soil Exploration for Construction of a new Government English Medium School in Matikole area under South Dum Dum Municipality, WB, India

6 months

Rs.  1,30,000/-

Completed

Soil Exploration & Recommendation

31

M/S Ruby General Hospital

 

Independent Assessment of effect of  vibration, emanating from installation of Sheet Piles using a vibro-sinker at Premises No. 576, Anandapur Plot 1-18 Sector 9-J under EKADPPS, Anandapur,  Kolkata -700 107, on the adjoining structures and providing guidance to the construction team

 

6 months

Rs. 1,70,000/-

Completed

Independent Assessment of effect of  vibration

32

Howrah Improvement Trust

Soil Exploration Work at three Plots of HIT

One year

Rs.   5,90,000/-

Completed

Soil Exploration & Recommendation

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

33

P. W. (CB) Directt.

Soil Exploration Work two colleges, one university and six BLRO Office  Sites at Burdwan

6 months

10,43,000/-

Completed

Soil Exploration & Recommendation

34

Highway Survey Division – III

P. W. (Roads) Directorate

Bhabani Bhawan, Kolkata 700 027

 

Geotechnical Investigation for the Construction of Proposed Elevated connector between Belgharia Expressway and Kalyani Expressway to bypass Barasat Town for North Benfal bound Traffic of NH34

6 months

Rs 3,50,000/-

Completed

Field Investigation with laboratory testing and foundation recommendation with state of the art methodologies

35

Irrigation & Waterways Directorate 

Soil Exploration Work in connection with the breach of closure work on the left bank of river New Cossye at Garh Purosottampur within Panskura Municipal area, District Purba Medinipur

 

6 months

Rs. 2,85,000/-

 

Completed

Soil Exploration & Recommendation

36

M/S Larsen & Toubro Limited, Construction Infrastructure IC

Vetting of detail design of substructures and superstructure of Kalyani ROB of KMDA Flyovers and  ROBs

6 months

Rs. 3,80,000/-

Completed

Vetting the modelling, analysis and Design of Superstructure and Substructure

37

M/S Larsen & Toubro Limited, Construction Infrastructure IC

Vetting of detail design of substructures and superstructure of Chandan Nagar ROB of KMDA Flyovers and  ROBs excluding span between P19 and P20 along with the proposed road including the minor bridge over river Saraswati

One Year

Rs. 9,00,000/-

Completed

Vetting the modelling, analysis and Design of Superstructure and Substructure including pavement design

38

M/S Universal Crescent Power Pvt. Ltd.

Liquefaction analysis for Industrial Activity at Nayachar

 

6 months

Rs. 1,50,000/-

Completed

Liquefaction analysis

39

M/S Netaji Subhas Chandra Bose Cancer Reserch Institute & Hospital, Kolkata

Design of Temporary Shoring System Using Sheet pile for 2B+G+3 Hospital Building

One yaer

Rs, 3,00,000/-

Completed

Design of Geotechnical & Structural Component of  Shoring system

 

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

40

M/s Fortune Multi-specialty Hospital Pvt. Ltd.

Planning and Design of Hospital Building at LALBAGH, MUSHIDABAD

 

One year

Rs. 12,50,000/-

 

Completed

Surveying, Soil Exploration, Planning, Analysis, Design and Working Drawing

41

M/S Express Devcon Pvt. Ltd

 

Assessment of vibration emanating from installation of Sheet Piles using a vibro-sinker at 52/1, Shakespeare Sarani, Kolkata -700 017

 

One year

Rs. 3,84,999/-

Completed

Vibration Monitoring and Mitigation

42

 

 

Traders and Engineers Pvt. Ltd.

Vetting of Design & Drawing prepared by our consultant in connection with the  proposed project of “ Design, Construction and Commissioning of R.C.C. Intake Jetty with Pump House mounted on the Jetty of capacity 2800 Cu.M  along with the Sub-Station Building all Civil and Electro-mechanical works complete, near Gouranga Ghat Road in Ward No. 3 under Panihati Municipality”.

 

 

3 months

Rs. 50,000/-

Completed

 

Vetting of the design and drawings

43

P. W. (CB) Directt.

Soil Exploration Work at  Five Sites at Burdwan Medical College Campus

 

4 months

Rs. 5,35,000/-

Completed

Soil Exploration & Recommendation

44

Traders and Engineers Pvt. Ltd.

Vetting / Approval of the Designs of the Diaphragm Wall System at IB167, Sector – III, Saltlake City, Kolkata

 

 

1 month

Rs. 50,000/-

Completed

Vetting of the design and drawings

45

IVRCL, Kalyani

Pile Integrity Testing at the Campus of National Institute of Bio-Medical Genomics at Kalyani, West Bengal, INDIA

 

1 month

Rs. 55,000/-

Completed

Testing and Analysis

46

Engineering Projects (India) LTD.

Soil Exploration for Cyclone Shelters at Village: Amtalia, District: Purba Medinipur.

 

3  months

---

Completed

Soil Exploration & Recommendation

47

( Agri Irrigation), Chinsurah (A-I) Division, Hooghly

Soil Exploration Work at Plot No. 2647 & 2646, Mouza – Baidyabati.

 

3  months

Rs. 79,500/-

Completed

Soil Exploration & Recommendation

48

HOWRAH IMPROVEMENT TRUST

Soil Exploration at different Infrastructure Projects of HOWRAH IMPROVEMENT TRUST ( ten sites)

One year

Rs. 14,94,450/-

Completed

Soil Exploration & Recommendation

 

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

49

M/S Minakshi Sarkar

Vetting of Foundation System and Superstructure Rajib Gandhi Stadium, Aizwal

6 months

Rs. 70,000/-

Completed

Vetting of the design and drawings

50

HOWRAH IMPROVEMENT TRUST

Soil Exploration Work at different Infrastructure Projects of HOWRAH IMPROVEMENT TRUST ( six sites)

 

6 months

Rs. 5,35,000/-

Completed

Soil Exploration & Recommendation

51

 

 

Traders and Engineers Pvt. Ltd.

Vetting of Design & Drawings prepared by consultant in connection with the Proposed Project “Design, Engineering, Construction of RCC Intake Jetty with Pump House, Gangway, Substation and Allied Civil works for  10P10  KMDA Bally WTP Project

 

 

3 months

Rs.52, 250/-

Completed

 

Vetting of the design and drawings

52

KoPT

Consultancy Services for Dyke on the Western Fringe of Sagar Iland

1 year

Rs. 3,00,000/-

Completed

Vetting of the design by WAPCOS Ltd. and Examination and vetting of the design by selected contractor

53

Students Health Home, Kolkata

Structural Design of Students Dormitory and Ancillary Infrastructure at Dihga, WB INDIA

 

6 months

--

Completed

Design and reinforcement detailing

54

Students Health Home, Kolkata

Soil Exploration  of Students Dormitory and Ancillary Infrastructure at Dihga, WB INDIA

 

 

3 months

Rs. 75000/-

Completed

Soil Exploration & Recommendation

55

Traders and Engineers Pvt. Ltd

Vetting and Design Drawing in connection with the Project of RCC Intake Jetty with mounted Pump House alng with substation Building on Shore at Jagatdal under Bhatpara Municipality KMDA

 

 

6 months

Rs.52, 250/-

Completed

Vetting of the design

56

Siliguri Jalpaiguri Development Authority

Design of Foundation system and Vetting of Structural analysis of 4th Market Complex, at Siliguri

 

3 months

Rs. 300000/-

Completed

 

Design and vetting Analysis

57

Siliguri Jalpaiguri Development Authority

Pile Integrity Testing at 4th Market Complex, at Siliguri

3 months

Rs. 1,58,750/-

Completed

Testing & Analysis

 

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

58

TATA Consulting Engineers Limited

Simulation Testing of Coal Washery Slurry for Designing Slurry Pond

6 months

Rs. 1,35,000/-

Completed

 

Simulation Study and Analysis

59

CESC Properties Ltd.

Assessment of vibration emanating from installation of Sheet Piles using vibro-shaker at SPENCER’s GALLERIA Site at 33 Syed Amir Ali Avnue, Kolkata – 700 017

6 months

Rs. 1,25,000/-

Completed

 

Analysis of Vibration and development of Isolation system

60

SENES, India

Kolkata Solid Waste Management Improvement Project

Started in March’ 08

 

---

Completed

Vetting of Analysis & Design of Geotecnical components

61

KoPT, India

Feasibility study for a suitable measure to protect the river bank at proposed terminal site of IWAI at Jogighopa, Assam, West Bengal

 

---

Rs. 75,000/-

Completed

Analysis & Design

62

BDO, Daspur,

India

Soil Investigation for the Proposed Administrative Building, DASPUR – II, Paschim Medinipur, West Bengal

 

0.5 year

---

Completed

Analysis & reporting

63

Hindalco Industries Limited, India

Soil Geochemistry, Fertility and Effectiveness of Various Environmental Control Measures for Bagru Mines, Lohardaga, Jharkhand

 

0.5 year

Rs. 68,000/-

Completed

Analysis

64

BSNL, India

Soil Investigation and Foundation Design of 40 m Tower at Barasat, Kolkata

 

0.5 year

Rs. 40,000/-

Completed

Analysis & Design

65

BSNL, India

Analysis and Design of MAAR Masts on Roof Top Around Kolkata

 

1.0 year

---

Completed

Analysis & Design

66

ECL, India

Investigation and Testing of Road Bridge at Lalmatia – Pirpainty Road

 

0.5 year

---

Completed

Analysis & Design

67

KMC, India

Soil investigation for the proposed Star Theatre, Kolkata

 

1.0 year

---

Completed

Analysis

68

KoPT, India

Volume of Dredging and Bulk Density of Dredged Material

1.5 years

Rs. 2,00,000/-

Completed

Modelling,Analysis guidelines

 

Sl. No

Sponsoring Agency

Title of the Project(s)

Duration

Amount (Rs.)

Status

Nature of work

69

HAM, Holland DCI, India

Testing of Dredged Soil at Haldia

 

4 years

Rs. 25,00,000/-

(Approx)

Completed

Analysis

70

BHEL, India

Field Quality Assessment for Concrete and Soil for Bakreshwar Thermal Power Project

 

4 years

Rs. 20,00,000/-

(Approx)

Completed

Quality control

71

NBCC

B+G+10 Residence for hon’ble Minister of Govt of WB at Alipore

6 months

Rs. 3,50,000/-

Completed

Vetting of Design and Drawing

72

NBCC

B+G+2 Kolkata House of Govt of WB

6 months

Rs. 3,50,000/-

Completed

Vetting of Design and Drawing

73

ILFS

Vetting of Drawing of 4 lane Elevated Corridor along Kazi Nazrul Avenue ( VIP Road)

2 years

Rs. 14,00,000/-

 

 

74

L&T

Design, engineering, procurement, construction and completion of 7.4 km, 2(two) lane elevated Road between Jinjira Bazar and Batanagar on Budge Budge Trunk Road in Kolkata along with the widening of the existing 2 (two) lane road by addition of two lanes on both sides of the elevated fly – over through construction of an at grade road and construction of a 1.5 m footpath at the side of at grade roads - Proposal for Vetting of detail design of road, substructure and superstructure.

3 years

Rs. 50,00,000/-

 

 

77

Adhunik Infrastructure (P) Ltd.

Technical Vetting of the Structural Modeling, Analysis, Design and Drawing of the Proposed Skywalk Bridge at Dakshineswar Temple in Kolkata

2 years

Rs. 5,00,000/-

 

 

80

M/S Sapoorji Pallonji Pvt. Ltd

Independent Assessment of effect of vibration, emanating from installation of driven piles in Sukhobrishti Project at Plot No. E1/E2 Action area  III, New Town -  Recommendations on feasibility of doing RCC  during driving of piles nearby and providing guidance to the construction team

6 months

Rs. 2,25,000/-

 

 

 

M/S Siddha

Independent Assessment of effect of  vibration, emanating from installation of  Piles using a vibro-sinker at SIDDHA SUBURBIA Project, Baruipur, on the adjoining structures and providing guidance to the construction team.

6 months

Rs. 2,00,000/-

 

 

 

 

Supervision of Sub-surface  Investigation and Preparation of Soil Report   for the Work of “Construction of 3MG Capacity Booster Pumping Station Near Sakuntala Park in HO-CHI-MIN Sarani Word No. 127”.

6 months

Rs. 1,50,000/-