A. List of funded R&D projects under Prof. M. Sengupta
|
As Principal Investigator: 7 nos. (All except Sl. No. 1 to 3 are completed) |
|
1. |
Project Name : Development of motor eccentricity and vibration monitoring systems and control strategies for switched reluctance motor-based drives Sanctioning Authority: SPARC, MHRD PI: Mainak Sengupta Indian Institute of Engineering Science and Technology, Shibpur Prof. Steven B Leeb Foreign PI: MASSACHUSETTS INSTITUTE OF TECHNOLOGY (MIT) United States of America, 97.24 Lakhs STARTED
|
|
2. |
Project Name : Design, Analysis and Fabrication of 0.25 hp Double Sided Axial Flux Switched Reluctance Motor (SRM) Drives for manual assist electric bicycle Sanctioning Authority: Murata Business Engineering (India) Private Limited Year of Sanction & duration: 2017, 30 months ( Oct. 2017 – April 2020) Amount: Rs. 59.87 Lakhs
|
|
|
Project Name : Design, development and testing of 3-phase permanent magnet machines and their converters Sanctioning Authority: DIT, GoI (NaMPET Phase II) Year of Sanction & duration: 2012, 43 months (01.06.2012 – 31.12.2015) Amount: Rs. 102.94 Lakhs PI |
|
4. |
Project Name : Design, fabrications and implementation of Cascaded CSI-fed Induction Heating Units Sanctioning Authority: DST, GoI Year of Sanction & duration: 2014, 36 months (28.08.2014 -27.08.2017 extended ) Amount: Rs. 39.0 Lakhs PI: M. Sengupta |
|
5. |
Project Name : Sanctioning Authority: DIT, GoI (NaMPET Phase-I) Year of Sanction & duration: 2005, 54 months Amount: Rs. 89.74 Lakhs PI: M. Sengupta |
|
6. |
Project Name : Development and validation of SEQUEL and Real time model of various electric drives for a "Full Spectrum Simulator" Sanctioning Authority: DIT, GoI (NaMPET Phase-I) Year of Sanction & duration: 2005, 36 months Amount: Rs. 15.25 Lakhs
|
|
7. |
Project Name : Design and development of a 500W, 36 V, 300 RPM Hub Switched Reluctance Motor, and 650 watts, 48 volts, 750 RPM conventional SRM for application in a scooter and auto-rickshaw drive Sanctioning Authority: Electrotherm (India) Ltd. Year of Sanction & duration: 2004, 12 months Amount: Rs. 1.21 lakhs
|
|
8. |
Project Name : Sensorless Switched Reluctance Motor Drive Sanctioning Authority: AICTE, GoI Year of Sanction & duration: 2000, 48 months Amount: Rs. 16.32 lakhs
|
|
As Co-Principal Investigator: 5 nos. ( all except Sl. No. 9 below are completed) |
||
9. |
Project Name : Development of high efficiency power electronic converter technology using next generation Si/SiC-based switching devices with integrated gate drivers for high frequency operation at reduced losses Sanctioning Authority: SPARC, MHRD PI/ Foreign PI: Prof. Hans Juergen Mattausch HIROSHIMA UNIVERSITY, Japan Amount: Rs. 90.5 lakhs STARTED
|
|
10. |
Project Name : Centre of Excellence for Development of Micro-structurally designed materials. Sanctioning Authority: TEQIP-II, GoI Year of Sanction & duration: 2013, extended till 2016 October Amount: Rs. 500.0 lakhs
|
|
11. |
Project Name : Fuel Cell Development Sanctioning Authority: DST, GoI Year of Sanction & duration: 2012, 36 months Amount: Rs. 37.0 Lakhs
|
|
12. |
Project Name : A Field Programmable Gate Array (FPGA) controller based real-time implementation of a commutatorless motor drive with selectable hard or soft characteristics Sanctioning Authority: AICTE, GoI Year of Sanction & duration: 2008, 24 months Amount: Rs. 4.2 lakhs
|
|
13. |
Project Name : Implementation of Robust Control Techniques through a DSP Platform on a Lab-scale real time system Sanctioning Authority: AICTE, GoI Year of Sanction & duration: 2004, 48 months Amount: Rs. 8.85 lakhs
|
C. B. List of Consultancy Projects (as Chief Consultant)
Sl. No. |
Sponsoring Agency |
Title of the Project(s)/ Patent(s) |
Period |
Amount |
Status |
1 |
Webel Mediatronics, Kolkata |
Design of 240kW, IGBT based buck – chopper |
48 months |
Rs. 1.00 lakhs |
Completed |
2 |
Webel ToolsInd, Kolkata |
Design of BLDC drive for ball-screw application |
12 months |
Rs. 0.65 lakhs |
Completed |
3 |
IIT Kharagpur & Tata Motors Ltd.,Pune ( under UAY, GoI) |
Design and development of P2 motor for hybrid EVs |
24 months |
Rs. 15.87 lakhs |
Started |
4 |
Shakti Pumps, Indore |
Design and analysis of IMs for submersible applications-Phase I |
5 months |
Rs. 4.26 lakhs |
To commence from February 2018 |