IIEST, Shibpur

Indian Institute of Engineering Science and Technology, Shibpur

(Formerly Bengal Engineering and Science University, Shibpur)

Empowering the nation since 1856

आई आई ई एस टि, शिवपुर

भारतीय अभियांत्रिकी विज्ञान एवं प्रौद्योगिकी संस्थान, शिवपुर

(पूर्व में बंगाल इंजीनियरिंग एंड साइंस यूनिवर्सिटी)

१८५६ से देश को सशक्त बनाना

Projects

Consultancy Project Completed

 

Sl. No.

Title

Organization

Duration

Year

Faculty

Involved

Nature of Work

1.

Design of Foundation system and Vetting of Structural analysis of 4th Market Complex, at Siliguri

Siliguri Jalpaiguri Development Authority

3 months

2011-2012

Dr. A. Ghosh & Dr. S.K. Dalui

Analysis, Design and Vetting

2.

Vetting of Foundation system of Aizwal stadium, Aizwal. 

Minakshi construction

3 months

2011-2012

Dr. A. Ghosh & Dr. S.K. Dalui

Vetting

3.

Testing of Paver Block at manufacture point, Panagorh

Calcutta Port Trust (CPT)

1 Year

2011-2012

Dr. S. Ghosh, Prof. S. Pal & Dr. S.K. Dalui

Testing of Paver Block

4.

Non Destructive Testing (NDT) of Presidency College Building, Kolkata

Presidency College authority

1 month

2011-2012

Dr. S. Ghosh, Prof. S. Pal & Dr. S.K. Dalui

NDT

5.

Vetting of Design and Estimation of Mahishadal Raj College building.

Mahishadal Raj College authority

3 months

2011-2012

Dr. S.K. Dalui, Dr. T.K. Roy & Prof. P.K. Lai

Vetting of Design and Estimation

6.

Vetting of Superstructure of Aizwal stadium, Aizwal. 

Minakshi construction

3 months

2012-2013

Dr. A. Ghosh & Dr. S.K. Dalui

Vetting

7.

Vetting of Residential Building (G+7) storied at Premises No. 89-MAR (SE) Plot No. DC 205.

Setu Co-operative Housing Limited.

3 months

2012-2013

Dr. A. Ghosh,  Dr. S.K. Dalui & Prof. A.K. Chakraborty

Vetting

8.

Design of Super Structure and Foundation of Multi- Speciality Hospital (G +3) storied at Lalbag, Murshidabad.

M/S Fortune Multi-Speciality Hospital PVT. LTD.

6 months

2013-2014

Dr. A. Ghosh & Dr. S.K. Dalui

Analysis and Design

9.

Vetting of Dedicated Water Supply System for IOCL, Refinery Haldia.

Haldia Integrated Development Agency Ltd, Haldia.

2 months

2013-2014

Dr. S.K. Dalui, Dr. T.K. Roy & Prof. P.K. Lai

Vetting

10.

Vetting of Design and Estimation of P.K. College building.

P.K. College authority

1.5 months

2013-2014

Dr. S.K. Dalui, Dr. T.K. Roy & Prof. P.K. Lai

Vetting of Design and Estimation

11.

Proof Checking of Detailed Design and Drawing of the foundation of Railway Bridge: in connection with gauge conversion work of Sakri-Nirmali & Jhanjharpur-Laukaha Bazar Section, East Central Railway.

BPC India PVT. LTD.

2 months

2013-2014

Dr. A. Ghosh,  Dr. S.K. Dalui, Prof. Sandip Chakraborty & Dr. A. Adak

Vetting

12.

Vetting of RADAR Tower at Dadanpatra.

Kolkata Port Trust

2 months

2013-2014

Dr. A. Ghosh & Dr. S.K. Dalui

Vetting

13.

Vetting of Multi-storeyed Building For Maharaja Nanda Kumar Mahavidyalaya,

HDA_Maharaja Nanda Kumar Mahavidyalaya authority

2 months

2013-2014

Dr. S.K. Dalui, Dr. T.K. Roy

Vetting

14.

Rebound Hammer and Ultrasonic Pulse Velocity test for the Airtel MSC Building, Kharagpur, Alipore & Asansol

BHARTI AIRTEL LIMITED

Salt Lake, Sector-5

1 month

2014-2015

Dr. S. Ghosh & Dr. S.K. Dalui

NDT

15.

Rebound Hammer test for Construction of 2/3 storied Building, H.S. School and Primary School Building, Sagar, South-24 Pargana (WB)

 (HRBC)

ST. Georges Gate Road

Kolkata: 700021

 

3 Weeks

2014-2015

Dr. S. Ghosh,  Dr. S.K. Dalui & Dr. S. Bhattacharyya

NDT

16.

Vetting of (G+3) storied college building at Viveknagar, Chaitanyapur, Sutahata, Purba Medinipur, W.B

Vivekananda Mission Mahavidyalaya authority

3 Months

2014-2015

Dr. S.K. Dalui, Dr. T.K. Roy & Prof. P.K. Lai

Vetting

17.

Civil design & construction of 0.5 MG semi-underground reservoir-cum pumping station & ancillary building.

Kolkata Municipal Corporation

3 Weeks

2014-2015

Dr. S. Ghosh & Dr. S.K. Dalui

NDT

18.

Vetting of Structural design and estimation of Mahishadal Mukta Mancha

HDA

2 months

2014-2015

Dr. S.K. Dalui & Dr. T.K. Roy

Vetting of Structural Design and Estimation

19.

Four Storied Class Room Building of Moyna College-1st Building

Moyna College authority

1 Month

2014-2015

Dr. S.K. Dalui & Dr. T.K. Roy

Vetting of Structural Design and Estimation

20.

Vetting of Design and Drawing of B+G+2 Kolkata House of Govt. of West Bengal at Alipore, Kolkata

 

National Building Construction Corporation Ltd

2 Months

 

2015-2016

Dr. S.K. Dalui, Dr. A. Ghosh & Dr. T.K. Roy

Vetting of Structural Design

21.

Vetting of Design and Drawing of B+G+10 Residence for Hon’ble Minister of Govt. of West Bengal at Alipore, Kolkata

National Building Construction Corporation Ltd

2 Months

 

2015-2016

Dr. S.K. Dalui, Dr. A. Ghosh & Dr. T.K. Roy

Vetting of Structural Design

22.

Renovation, Rehabilitation and Strengthening of Old Arched Masonry Bridge over river Banka at Birhata on G. T. Road Burdwan

BDA

2 Months

 

2015-2016

Dr. S.K. Roy,   Dr. S.K. Dalui, Dr. A. Ghosh & Dr. T.K. Roy

Strengthening of Old Arched Masonry Bridge

23.

Design of Bellilious Park Tower

Howrah

 

M/S Panchdeep Construction Ltd.

545 G.T. Road Howrah - 711101

1 Month

 

2015-2016

Dr. S. Ghosh & Dr. S.K. Dalui

Analysis and Design

24.

Four Storied Class Room Building of Moyna College-2nd Building

Moyna College authority

1 Month

2015-2016

Dr. S.K. Dalui & Dr. T.K. Roy

Vetting of Structural Design and Estimation

25.

Design and Construction Of Pedestrianisation &

Traffic decongestion of Dakshineswar Temple Area on Turnkey

Basis Under State Fund.

Kolkata Metropolitan Development Authority

2 Yrs

2016-2017

Dr. A. Ghosh & Dr. S.K. Dalui

Vetting of Structural Analysis and Design

26.

Planning, Design and Construction of 5 Medical Colleges in the State of West Bengal for WBMSCL

West Bengal Medical Services Corporation Ltd.(WBMSCL)

2Yrs

2017-2019

Dr. K. K. Chatterjee,

Dr. A. Ghosh &

Dr. S.K. Dalui

Vetting of Structural Analysis and Design

27.

Construction of Annexe Building of Haldia Bhawan

HDA

3 Months

2017-2018

Dr. S.K. Dalui & Dr. T.K. Roy

Vetting of Structural Analysis and Design

28.

Preparation of DPR for construction of ANNEX building

MAHANADI COALFIELDS LIMITED (MCL)

3 Months

2017-2018

Dr. A. Ghosh &

  Dr. S.K. Dalui

Vetting of Structural Analysis and Design

29.

Superstructure of Composite Steel Girder of

Proposed Bardhaman ROB

Rail Vikas Nigam Ltd. (RVNL)

3 Months

2017-2018

 Dr. A. Ghosh &

 Dr. S.K. Dalui

Vetting of Structural Analysis and Design

30.

Proposed Construction of Pipe Carrier Structural Bridge (Approx. 88.15m Long)

HDA

1 Month

2018-2019

Dr. S.K. Dalui & Dr. T.K. Roy

Vetting of Structural Analysis and Design

31.

Proposed Sub-Station at G.C. Berth

Haldia Dock Complex

Kolkata Port Trust

(Haldia Dock Complex)

2 Months

2018-2019

Dr. S.K. Dalui & Dr. T.K. Roy

Structural Analysis and Design

32.

Modification of Existing Approach Trestle at Third Oil Jetty at Haldia.

Kolkata Port Trust

(Haldia Dock Complex)

1 Month

2018-2019

Dr. S.K. Dalui & Dr. T.K. Roy

Vetting of Structural Analysis and Design

33.

Construction of Proposed Major Culvert over Channel Dehati at Kolaghat, Purba Medinipore

HDA

1 Month

2018-2019

Dr. S.K. Dalui & Dr. T.K. Roy

Vetting of Structural Analysis and Design