IIEST, Shibpur

Indian Institute of Engineering Science and Technology, Shibpur

(Formerly Bengal Engineering and Science University, Shibpur)

Empowering the nation since 1856

आई आई ई एस टि, शिवपुर

भारतीय अभियांत्रिकी विज्ञान एवं प्रौद्योगिकी संस्थान, शिवपुर

(पूर्व में बंगाल इंजीनियरिंग एंड साइंस यूनिवर्सिटी)

१८५६ से देश को सशक्त बनाना

Research Projects 

  • "Investigating the environmental transformation of organoarsenicals through photolytic mechanisms" sponsored by UGC (2013-2014)
  • “Use of Surfactant Treated Sludge for the Removal of Persistent Organic Pollutants (POPs) from Water Environment” sponsored by DST New Delhi (2007-2011)

Consultency Projects 

  • Proposal for Artificial Recharge and Rainwater Harvesting Scheme for Joydev Coal Block at Birbhum District, West Bengal (Khagra Joydev Resources Private Limited)
  • Preparation of EIA-EMP Report and River Bank Protection in 6 MGD Intake Jetty with Pumping Station at Halisahar under KMDA Area (KMDA)
  • Tunnel effluent sample analysis and associated mitigation measures (TRANSTONNELSTROY – AFCONS J. V., UG1, Kolkata East-West Metro Project)
  • Feasibility Report on Shifting of Toilet of Chamber No. 4 at 1st Floor of Main Building, Hon’ble High Court, Calcutta (Executive Engineer, Public Works Department (PWD), Calcutta West Division, 8th Floor, B Block, New Secretariat Building)
  • Analysis of impact on environment and propose necessity of EIA study for the proposed conversion of 2 Naphtha Storage Tank to High Speed Diesel at POL storage Depot, Bharat Petroleum Corporation Limited, Shahjahanpur, UP. (Sonar Bharat Environment & Ecology Pvt. Ltd.)
  • Vetting of Hydraulic Design and Drawing of Storm Water Drainage System of lake Gardens Area under Borough – X of KMC followed by proposal of Drainage Pumping Station (Comtel Consultants & Infraprojects Pvt. Ltd.)
  • Proof Checking of Detailed Design and Drawing of the Foundation of Railway Bridges: in connection with gauge conversion work of Sakri Nirmali & Jhanjharpur - Laukaha Bazar Section, East Central Railway (B.P.C. India Pvt. Ltd.)
  • Post Construction Inspection of Sewer Line Work at Doomrajala Scheme – I, Phase II Work (Howrah Improvement Trust)