IIEST, Shibpur

Indian Institute of Engineering Science and Technology, Shibpur

(Formerly Bengal Engineering and Science University, Shibpur)

Empowering the nation since 1856

आई आई ई एस टि, शिवपुर

भारतीय अभियांत्रिकी विज्ञान एवं प्रौद्योगिकी संस्थान, शिवपुर

(पूर्व में बंगाल इंजीनियरिंग एंड साइंस यूनिवर्सिटी)

१८५६ से देश को सशक्त बनाना

Publications

Journal

  • Dey, N. C., Pal, S., Roy. G. C. & Sahana, S. K., “A Look into Physiological Response of Selective Underground Coal Miners in the Ambit of Underground Environment”, Minetech, Vo. 32, No. 4, Oct-Dec, 2011, pp. 48-54.
  • Prasad, A. & Roy, G. C., “Instrumentation for Strata Control in Continuous Miner Face in Underground Coal Mines in India”, Minetech, Vol. 32, No. 4, Oct-Dec, 2011, pp. 3-15.
  • Roy, G. C. & Dey, N. C., “Optimization of Quick Setting Cement (QSC) Ingredients for Improving its Strength and Control Immediate Roof in Underground Mines”, MGMI Transactions, Vol. 107, April 2010 – March 2011, pp. 71-79.
  • Roy, G. C. & Dey, N. C., “Chemical Analysis of Cement Ingredients Suitable for Underground Coal Mines with SEM/EDX”, Minetech, Vol. 31, Oct-Dec, 2010, pp. 50-55.
  • Roy, G. C. & Dey, N. C., “Control Factors in Indian Longwall Mines”, The Indian Mining & Engineering Journal, Oct, 2007, Vol. 46, No. 10, 2007, pp. 126-128.
  • Bhattacharya, J., Roy, G. C. & Ghosh, A. K., “Planning a Longwall Mine Face and Performance Parameters – A Verification of Existing Design in Jhanjra Longwall Mine in Eastern Coalfields Limited” Minetech, Vol. 13, Jan-1992, pp. 45-53.

International Conference

  • Roy, G. C. & Dey, N. C., “Optimization of Time Duration to Install Face Equipment at Longwall Face in India Coal Mines”, 37th International Symposium on Application of Computers and Operations Research on Mineral Industries (APCOM 2015) organized by University of Alaska Fairbanks, United States in cooperation with The Society for Mining, Metallurgy & Exploration (SME) on May, 23rd - 27th, 2015, pp. 598-606.
  • Roy, G. C., “Shale Gas: Technological Approach and Prospects in India”, International Conference on “Coal and Energy – Technological Advances and Future Challenges (CETAFC 2013)”, organised by Bengal Engineering and Science University, Shibpur, 15th-17th December, 2013, pp. 45-58.
  • Prasad, A. & Roy, G. C., “Causes of Discrete Behaviour on Roof Sagging due to Underground Mining”, International Conference on “Coal and Energy – Technological Advances and Future Challenges (CETAFC 2013)”, organised by Bengal Engineering and Science University, Shibpur, 15th-17th December, 2013, pp. 153-159.
  • Maiti, J. & Roy, G. C., “Safety in Mining Supply Chain”, Proceedings of the International Conference on “Mineral Industry in the New Economy – Challenges and Opportunities”, January 15th – 16th, 2009, ISM Alumni Association, Kolkata Chapter, pp. 219-226.

National Conference

 

  • Roy, G. C. & Dey, N. C., “Development and Verification of Performance of Quick Setting Cement for Reduction of Roof Fall Accidents in Underground Coalmines”, National Seminar on “Development of Coal and Mineral Resources: - Economic, Technological and Environmental Issues” Jointly organised by Institute of Engineers (India) and Bengal Engineering and Science University, Shibpur, Presented on 23-24th February, 2012, pp. 28 (abstract).
  • Prasad, A. & Roy, G. C., “Impact of Significant Factors on Strata Control During Depillaring Operation with Continuous Miner in Underground Coal Mines in India”, National Seminar on “Development of Coal and Mineral Resources: - Economic, Technological and Environmental Issues” Jointly organised by Institute of Engineers (India) and Bengal Engineering and Science University, Shibpur, Presented on 23-24th February, 2012, pp. 19 (abstract).
  • Roy, G. C. & Dey, N. C., “Role of Some Critical Parameters on the Performance of Quick Setting Cement Installation with Roof Bolt in Underground Coal Mine”, National Seminar on Coal Mining “The Future of Overground Lies Below Ground”, jointly organised by DGMS and SCCL, Hyderabad 28th August 2010, pp. 147-151.
  • Roy, G. C., “An Overview on Breakdown of Face Equipment in a Longwall Face in India”, National seminar on Rock-Machine Interaction in Excavations Organised by Centre of Advanced Study, Department of Mining Engineering, I. T. BHU, 17th-18th March, 2008, pp. 143-149.
  • Roy, G. C. & Dey, N. C., “ An Overview on Breakdown of LHD and SDL in an Indian Underground Coal Mines”, National Seminar on “New Mining Initiatives for Sustainable Development”, Organised by Bengal Engineering and Science University, Shibpur, 17th No. 2007, pp. tech3/1-3/6.
  • Roy, G. C. & Dey, N. C., “Effect of Powered Support Design in Longwall Production Performance in India”, National Seminar on Productivity in Indian Coal Mines organised by World Confederation of Productivity Science, 18th-19th Jan, 2007, pp. 45-52.