Recent R&D Project List
Title of the Project |
Funding Agency/ Institute with amount approved |
Year of duration |
Amount |
Completed / ongoing |
||
Development of Indian Highway Capacity Manual |
CSIR- Central Road Research Institute, Govt. of India |
|
Ongoing |
|||
Identification of Spatial Dispersion Pattern of Dredge Materials in a Coastal River Reach from Radioactive Tracer Experiments and Hydrodynamic Modelling |
BRNS, DAE, Govt. of India |
2013-2016 |
Rs. 34 Lakhs |
Ongoing |
||
Development and Application of Potentially Important Jute Geo-Textiles |
CFC, The Netherlands |
2012-16 |
Rs. 40 Lakhs |
Ongoing |
||
Seismic Vulnerability Assessment of Existing Building to Supplement Rehabilitation practices with special emphasis to North Eastern Region |
DST, Govt. of India , TSD Programme |
2013-16 |
Rs. 62 Lakhs |
Ongoing |
||
Passive control of seismically excited short period structures by the compliant liquid column damper |
DST, Govt. of India |
2012-15 |
Rs. 34 Lakhs |
Ongoing |
||
|
DST, Govt. of India , TSD Programme |
2013-16 |
Rs. 39.554 Lakhs |
Ongoing |
||
Near surface Geophysical nd Geotechnical Investigation for Site-specific Earthquake Hazard and Slope Stability studies in and around Gangtok via-a-via its Vulnerability and Risk Implications (VIS) |
Ministry of Earth Science
|
Three years August 2015 - |
37.62 Lakhs |
ongoing |
||
Wind effects on Irregular Plan Shape Tall Buildings |
DST, Govt. of India |
- |
Rs. 3.6 Lakhs |
Ongoing |
||
Water, Sanitation and Hygiene Education Programme in School |
Water for People (USA) |
2013-15 |
|
completed |
||
Demonstration of Integrated Fluorosis Mitigation Approaches in Malda |
UNICEF |
2014-15 |
|
completed |
||
Static and dynamic failure analysis of hybrid laminated composite stiffened plates for marine structures |
Ministry of Shipping |
2012-15
|
39.53 Lakhs |
completed |
||
Assessment of effects of arsenic pollution on health in rural Bengal and development and implementation of sustainable technology solution |
UKIERI, British Council, UK |
2011-2014 |
£40,000 |
Completed |
||
Hydrogeological study of sub-surface water flow/storage characteristics for creation of sustainable source on rain fed river for semi-arid and fluoride affected six blocks in connection with comprehensive water security plan for Damodar&Kangsabati River under Bankura district. |
PHED (West Bengal) |
|
Rs. 63.0 Lakhs |
Completed |
||
Geometric nonlinear thermo-mechanical analysis of FRP bridge deck |
DST, New Delhi |
2012-15 |
Rs. 18.0 Lakhs |
Completed |
||
Preparation of Ganga River Basin Environmental Management Plan, in partnership with IIT Consortium |
MoEF, GoI |
|
Rs. 4.0 Lakhs (for first 3 quarters) |
Completed |
||
Rural road pavement performance study |
NRRDA, Govt. of India |
|
Rs. 4.0 Lakhs |
Completed |
||
Technology Development of high performance fibre reinforced concrete composites for different applications |
Tata Steel |
|
Rs. 17.5 Lakhs |
Completed |
||
Details study on performance of concrete mixes made with ACC cement visa-vice than other cement Brand |
ACC Cement |
|
Rs. 2.25 Lakhs |
Completed |
||
Household Arsenic Mitigation Programme in Raichur, Karnataka |
UNICEF |
|
Rs. 17.64 Lakhs |
Completed |
||
Integrated Fluoride Mitigation in Purulia District |
UNICEF |
|
Rs. 10.5 Lakhs |
Completed |
||
Development of a Novel Nondestructive Robust Structural Health Assessment Technique with Minimum Noise Contaminated Information |
DST, Govt. of India |
|
Rs. 6.2 Lakhs |
Completed |
||
Seismic Hazard Assessment, Microzonation and Evaluation of Vulnerability, Risk and Socio Economic Impacts for the City of Kolkata |
Ministry of Earth Science, Govt. of India |
|
Rs. 8.0 Lakhs |
Completed |
||
Utilization of alternative materials for construction of subgarde and sub base layer of flexible pavements |
UGC |
|
Rs. 7.0 Lakhs |
Completed |
||
Wind effects on Irregular Plan Shape Tall Buildings |
DST, New Delhi |
|
Rs. 3.6 Lakhs |
Completed |
||
Factorial design approach to investigate the model parameters for prediction of arsenic removal by electrocoagulation using solar energy |
UGC |
|
Rs. 2.0 Lakhs |
Completed |
||
Use of Surfactant Treated Sludge for the Removal of Persistent Organic Pollutants (POPs) from Water Environment |
DST, New Delhi |
|
Rs. 12.24 Lakhs |
Completed |
Recent Consultancy Projects
Title of the Project |
Funding Agency/ Institute with amount approved |
Year / duration |
Amount |
Construction of Subway at Shalimar Railway Station |
IRCON INTERNATIONAL LIMITED |
3 months |
Rs. 0.98 Lakh |
Soil Investigation for the Proposed Construction of Youth Hostel ( Biswa Bangla Yuba Abas), at 4/1 Moore Avenue, Tollygunge, Kolkata |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal |
6 months |
Rs. 3.2 Lakhs |
Soil Investigation for the Proposed Construction of three storied office building of SPF Tollygunge, two storied Group C staff quarters, three nos. four storied Group D staff quarters and single storied change room. |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal
|
6 months |
Rs. 1.48 Lakhs |
Soil Investigation for the Proposed Construction of Govt. Polytechnic at Behala, Kolkata |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal |
6 months |
Rs. 3.05 Lakhs |
Soil Investigation for the Proposed Construction of an English Medium School of SourindraVidyapith, Behala, Kolkata |
Kolkata Division, Social Sector, P. W. Dte., Govt. of West Bengal |
6 months |
Rs. 1.45 Lakhs |
Strengthening and Widening to 2 lane/2-lane with paved shoulder configuration of Ghatakpukur – Malancha – Sarberia Section of Kolkata Basanti Road (Section of SH-3) in West Bengal |
ADHUNIK INFRASTRUCTURE (P) LTD.
|
6 months |
Rs. 2.2 Lakhs |
Third party consultancy for 100MGD Water Transmission Project from Hooghly River (at Rani DevendrabalaGhat) to New Town, Rajarhat |
Simplex |
2013-15 |
Rs.521 Lakhs |
Inspection work of VidyasagarSetu along with approach viaducts and interchanges under BESU cell of HRBC. |
HRBC |
HRBC |
Rs. 257 Lakhs |
Traffic Study for proposed elevated connector between Belghoria Expressway and Kalyani Expressway |
Executive Engineer, P. W. (Roads) Directorate, Govt. of W Bengal |
2014 |
Rs. 2.60 Lakhs |
State Technical Agency, PMGSY |
PMGSY |
|
Rs. Lakhs |
Safety Consultant for Four laning of Krishnagar – Baharampore Section and Barasat – Krishnagar Section of NH-34 |
National Highways Authority of India |
2014 |
Rs. 116 Lakhs |
Consultancy Services for Safety Engineering: for Strengthening and Widening / Reconstruction of Chandrapura – Bhandaridah - Phusro Railway Crossing –Kathara - Gomia Road
|
Ram Kripal Singh Construction (P) Ltd., Ranchi, Jharkhand |
2014 |
Rs. 20 Lakhs |
Vetting of pavement design of strengthening and widening to part of Kolkata – Basanti Road (SH-3) for the project of West Bengal Highway Development Corporation Limited |
M/S Solo Consulting Services Pvt. Ltd. |
2014 |
Rs. 0.75 Lakhs |
Design of Pavement of Habra-Kumra Road and NaihatiJirat Road |
Executive Engineer, Barasat Highway Division II, PW (Roads) Directorate, Govt. of West Bengal |
2014 |
Rs. 5.50 Lakhs |
Assessment of vibration emanating from installation of Sheet Piles using a vibro-sinker at 52/1, Shakespeare Sarani, Kolkata -700 017 |
M/S Express Devcon Pvt. Ltd
|
|
|
Analysis of Bottom Ash and Steel Plant Slag Material in Ash Dyke as substitute of Sand
|
NSPCL |
2014-15 |
Rs. 1.2 Lakhs |
Vetting of various Civil Engineering Structures |
Haldia Development Authority |
Continuing Since 2006 |
|
Vetting of various Civil Engineering Structures |
Bardhaman Development Authority |
Continuing Since 2011 |
|
Design of Pavement of Habra-Kumra Road and NaihatiJirat Road |
Executive Engineer, Barasat Highway Division II, PW (Roads) Directorate, Govt. of West Bengal |
2014 |
|
Vetting of pavement design of strengthening and widening to part of Kolkata – Basanti Road (SH-3) for the project of West Bengal Highway Development Corporation Limited |
M/S Solo Consulting Services Pvt. Ltd. |
2014 |
|
Vetting of pavement design of strengthening and widening to Barjora to Mejhia (Durlavpur More) Road for the project of West Bengal Highway Development Corporation Limited |
M/S Caritas Infra Consulting Pvt. Ltd. |
2014 |
|
Vetting of pavement design of strengthening and widening to 2 lane / 2 lane with paved shoulder of a Section of SH -6 for the project of West Bengal Highway Development Corporation Limited |
M/S CE Testing Company Pvt Ltd |
2014 |
|
Roughness Survey from Jinzira Bazar to Batanagar on Budge Budge Truck Road |
C E Testing Pvt. Ltd. |
2014 |
|
Traffic Study for proposed elevated connector between Belghoria Expressway and Kalyani Expressway |
P. W. (Roads) Govt. of West Bengal |
2014 |
|
Post Construction Inspection of Sewer Line Work at Doomrajala Scheme – I, Phase II Work |
Howrah Improvement Trust |
2013 |
0.5 Lakh |
Proof Checking of Detailed Design and Drawing of the Foundation of Railway Bridges: in connection with gauge conversion work of SakriNirmali&Jhanjharpur - Laukaha Bazar Section, East Central Railway |
M/s. B.P.C. India Pvt. Ltd. |
2013 |
3.37 Lakhs |